Crane Assembly Disassembly Director

This course covers OSHA’s construction crane requirements for the Assembly/Disassembly (A/D) Director, including 29 CFR 1926.1403 through 1926.1406 and the post-assembly inspection requirements of 1926.1412. Because the A/D Director is responsible for the overall safety of the operation, the course prepares participants to plan, direct, and verify crane assembly and disassembly in compliance with OSHA requirements and manufacturer procedures.

The A/D Director

Assembly/Disassembly Standards, A/D Director’s Role, Other Roles in Assembling Cranes

Site Selection and Conditions

Crane Characteristics, Using Outriggers, Working Near Power Lines, Minimum Clearance Distances, Assembly and Disassembly Around Power Lines

Assembly Procedures

Basic Assembly Procedures, Assembling a Lattice Boom Crawler Crane, Disassembling a Crane

Assembling Jibs and Extensions

Assembling a Lattice Boom Jib, Erecting a Swing-away, Erecting an A-Frame Mounted from Under the Boom, Erecting a Fly, Installing an Auxiliary Boom Head, Luffing Jib Setup

Inspections

Post–Assembly Inspection

COURSE LENGTH:

2 Days

Have Questions?

Our experts are ready to help.