This course covers OSHA’s construction crane requirements for the Assembly/Disassembly (A/D) Director, including 29 CFR 1926.1403 through 1926.1406 and the post-assembly inspection requirements of 1926.1412. Because the A/D Director is responsible for the overall safety of the operation, the course prepares participants to plan, direct, and verify crane assembly and disassembly in compliance with OSHA requirements and manufacturer procedures.
The A/D Director
Assembly/Disassembly Standards, A/D Director’s Role, Other Roles in Assembling Cranes
Site Selection and Conditions
Crane Characteristics, Using Outriggers, Working Near Power Lines, Minimum Clearance Distances, Assembly and Disassembly Around Power Lines
Assembly Procedures
Basic Assembly Procedures, Assembling a Lattice Boom Crawler Crane, Disassembling a Crane
Assembling Jibs and Extensions
Assembling a Lattice Boom Jib, Erecting a Swing-away, Erecting an A-Frame Mounted from Under the Boom, Erecting a Fly, Installing an Auxiliary Boom Head, Luffing Jib Setup
Inspections
Post–Assembly Inspection