Every crane lift, large or small, requires planning, from pick points and swing radius to potential obstructions and weather conditions. This course covers the key elements of lift planning for both standard and critical lifts, as outlined in ASME P30.1, Planning for Load Handling Activities.
Need for Lift Planning
Why Every Lift Needs a Plan, The ASME P30.1 Standard, Planning as a Process Rather Than Equipment, Evaluating All Load Handling Activities, Scope of P30.1, Key P30.1 Terms, Load Handling Activities (LHA), Load Handling Equipment (LHE), Roles in Lift Planning, Related Standards
Principles of Lifting
Leverage, Support, Stability, Structural Strength, Dynamic Lifts, Lifts Over Water, Shock Loading, Side Loading
Load and Capacity
Rated Capacity vs. Load Weight, Calculating Net Capacity from Gross Capacity, Determining Load Weight, Determining Capacity, Overhead Crane Capacity Without a Load Chart, Mobile Crane Load Charts, Tower Crane Load Charts
Critical Lifts
Defining a Critical Lift, Criteria for Determining Whether a Lift Is Critical, Planned Engineered Lifts on Overhead Cranes, Standard Lift Planning, Critical Lift Planning
Parts of the Plan
Load, Load Handling Equipment, Rigging, Load Travel Path, Personnel, Site Conditions, Communication, Site Control, Contingency Considerations, Emergency Lift Plans, Pre-Lift Meeting, Implementing the Plan, Post-Lift Review, Lift Planning Exercises
Rigging
Determining Center of Gravity, Slings, Calculating Sling Loads